Archive : 上海夜网RS

PHOTO: TSHD River Thames Out on the Sea Again

first_imgImage source: DEMEFollowing the completion of successful sea trials, the 2.300m³ trailing suction hopper dredger (TSHD) River Thames went out on the sea again for a series of dredging trials, DEME Group announced today.This compact hopper with a small draught will soon reinforce their fleet and is ideally suited for dredging works in shallow waters and on sea and inland waterways.The vessel is designed to maintain sea and inland waterways, as well as perform land reclamation. It is equipped with the latest electronic system to improve positioning, sounding and execution of dredging work.To minimize environmental impact during dredging, the vessel is equipped with the latest innovation in the field of overflow – the IHC Plumigator.last_img

Dutch operator curbs gas production from North Sea field over low prices

first_imgThe Q10-A field started producing gas in February 2019. The development required the installation of a 42km pipeline from the Q10-A location to the P15d platform for export. Heerema Fabrication Group built the unmanned offshore platform, which was installed offshore in December 2018 The average realized gas price was 5.6 €/MWh during 2Q compared with 9.9 €/MWh in the previous quarter. As a result, 119 million standard cubic meters of gas have been produced during the second quarter of the year. However, according to Tulip’s update on Monday, the production from the Q10-A field has been partially reduced to “leave gas in the ground” in view of the current low gas prices. Tulip Oil added it continues to mature additional new drilling targets predominantly to appraise reservoirs near the producing Q10-A field. Steps are also being taken to increase production capacity substantially by activating existing third-party compression facilities. Spare production capacity is being managed in conjunction with the gas price outlook. Tulip said that the production is being maintained at some 1 million cubic meters of gas per day. The reservoir models have been calibrated and preparations continue for two additional future Q10 wells. In the first quarter of 2020, Tulip produced 198 million standard cubic meters of gas from the field. Dutch exploration and production operator Tulip Oil has reduced its gas production from the Q10-A gas field located in the Dutch sector of the North Sea due to low gas prices. These targeted reservoirs have been drilled historically and flowed gas to the surface, similar to Q10 before the 2015 “discovery” well.last_img read more

The battle to succeed Sepp Blatter as FIFA President is already underway.

first_imgHis decision came just four days after winning a fifth term in office.Prince Ali Bin Al-Hussein, who was defeated during last Friday’s election, has already indicated that he will run once again.Kuwaiti executive committee member, Sheikh Ahmad Al Fahad Al Sabah has also said he will seek a nomination.last_img

Arsenal outgun Cologne

first_imgArsenal came from 1-nil down to beat German side Cologne 3-1 in their delayed Europa League game.The match started an hour late because of fears over crowd safety when thousands more Cologne fans arrived in north London than expected.Police confirmed there was disorder at the stadium. It wasn’t a good night for Everton in their group-stage opener as they lost 3-nil at Italian side Atalanta.last_img